Latest News

divider
  • PROBLEMS IN CAPTIVE COAL MINING

    blocks, with geological reserves of about 15.7 billion tonnes, were earmarked for the power sector. Currently, the allocation coal mining blocks to companies, other than Coal India Ltd (CIL), is done either under the government company dispensation route4 or through the captive dispensation route. These blocks for power sector, have been further

  • Captive Mining Block Previous Ministry of Coal

    Lignite blocks allocated Detailed List of 148 coal blocks initially identified ; Deposition of cost of Geological Report by the block allottees (dated 27/08/2009) Allocation of Moira Madhujore North & South Coal Block in state of West Bengal for Captive Mining of Coal-

  • Captive coal blocks: Latest News & Videos, Photos about

    Captive coal blocks produce nearly 4 million tonnes in October 23 Nov, 2019, 10.12 PM IST. According to data compiled by the Coal Controller Organisation, production from captive coal blocks during April-September 2019 rose nearly 26% to 26 million tonnes against the previous corresponding period.

  • What is a Captive coal block? Answers

    A block is an area from which the government has granted permission in the form of a mining license to mine coal. The term "captive" infers being locked up. In the sense of a policy, it is a

  • Coal blocks in India no longer 'captive'; Steel, power

    Jan 09, 2020· Captive coal blocks produced only 25.1 million tonne (MT) in FY19, much lower than the peak output of 43.2 MT in FY15 when the Supreme Court had

  • Govt to allot 9 coal blocks to PSUs for captive power

    Jun 11, 2018· Applications for another seven coal mines for captive power generation have also been invited. Of the seven reserved for power generation, one is proposed to be allotted under ultra mega power projects model where the state calls tariff-based competitive bids and the lowest bidding firm is awarded the coal block for power generation.

  • What is captive (coal) mining? Quora

    Sep 23, 2016· Let's try to understand this with NTPC context. NTPC use coal for its thermal power projects to produce electricity. NTPC has contracts with many companies like Coal India which produces coal and sell it to NTPC and takes huge money in return. Now...

  • Coal blocks News Latest coal blocks News, Information

    Captive coal blocks produce around 4 million tonne output in October. Out of the total, production from blocks not cancelled by the Supreme Court, Moher & Moher Amlori Extension (1.7 MT) and Pakri Barwadih (0.740 MT) was 2.429 million tonnes.

  • Coal Mining Block Ministry of Coal, Government of India

    Show cause notice in respect of Gare Palma IV/5 coal block allocated for captive mining for supply of coal to sponge iron plant at Raipur by M/s Monnet Ispat Ltd. regarding. pdf : 832.76 KB : 20/02/2015: Questionnaire requesting views/comments latest by 20th feb 2015 by

  • Govt to allot 9 coal blocks to PSUs for captive power

    Jun 11, 2018· Applications for another seven coal mines for captive power generation have also been invited. Of the seven reserved for power generation, one is proposed to be allotted under ultra mega power projects model where the state calls tariff-based competitive bids and the lowest bidding firm is awarded the coal block for power generation.

  • Court orders Centre to produce records on coal block

    Sep 18, 2013· Justice Lodha also wanted to know from the AG how many private captive power plants were allocated coal blocks between 1993 and 2003; 2003

  • Coal Mining Block Ministry of Coal, Government of India

    Show cause notice in respect of Gare Palma IV/5 coal block allocated for captive mining for supply of coal to sponge iron plant at Raipur by M/s Monnet Ispat Ltd. regarding. pdf : 832.76 KB : 20/02/2015: Questionnaire requesting views/comments latest by 20th feb 2015 by

  • Captive coal miners allowed to sell 25% output in open

    Oct 25, 2018· The coal ministry has invited tenders seeking bids for 18 captive coal blocks to non-power plants in Jharkhand, Madhya Pradesh, Maharashtra, West Bengal, Odisha and Chhattisgarh. “The successful bidder shall utilise a minimum of 75% of the actual production in the specified end use plants and is allowed to sell up to 25% of the actual

  • India proposes legislative changes to blur distinction

    In a first step that would partially blur the distinction between captive and commercial coal mining, India’s Coal Ministry would amend mining legislation to enable companies free merchant sale of coal in the open market. According to officials, the Coal Ministry would initiate amendments to the Mines, Minerals Development and Regulation Act (MMDRA) 2015 that would provide legislative

  • CBI Court Convicts Mr Dilip Ray & 5 Others in CTL Coal

    Oct 07, 2020· A special CBI court has convicted Mr Dilip Ray, the then Union Minister of State for Coal in the government under Atal Bihari Vajpayee in 1999, for his alleged involvement in the coal block

  • Coal Mining And MDO Model In India Energy and Natural

    However, the sector witnessed a major overhaul after the Supreme Court of India, in 2014, quashed allocation of 214 coal blocks cancelling nearly all existing permissions for the captive mining of coal blocks. The verdict set the ground for fresh legislation and reform in the coal industry. 2

  • Coal and Mining Sector Civilsdaily

    Dec 18, 2015· The mining lease owners, who did not receive their requisite green clearances on time, used to start their mining operations and then wait for the clearances; But, by SC judgment they have to obtain green clearances first; Many states have allocated mining blocks via auction but their green clearance is still pending

  • Ministry of Mines

    On the lines of commercial coal mining, all mineral blocks may also be auctioned for commercial mining without distinction of captive or merchant mines. The proposal seeks to remove distinction between captive and merchant mines by ensuring that in future all mines

  • Ministry of Mines

    sold due to the restriction in law.. On the lines of commercial coal mining, all mineral blocks may also be auctioned for commercial mining without distinction of captive or merchant mines. The proposal seeks to remove distinction between captive and merchant mines by ensuring that in future all mines will be auctioned without any end

  • Reforms push to coal is justified The Hindu BusinessLine

    Jun 22, 2020· Captive mining of small blocks, a decontrol move that was initiated in 1993 and continued right up to the coal scam, has been an inefficient process. leading to power

  • FSPDB Mersen

    captive metric wire termination screws. Screws can never be lost. • Available accessories: For multi-pole panel mounting, simply snap in pins for rigid fit. Cap plugs provide the ability to maintain touch safety on unused openings. Circuit identification markers simply snap into blocks to ID circuits. End anchors provide rigid end stops.

  • G006 SourceWatch

    The Ministry of Coalallocated 194 coal blocks (net)2 for captive mining upto 31 March 2011. Out of these, 142 were explored blocks (GR: 23,391 MT) and the balance 52 were either regionally explored or unexplored coal blocks (GR.. 20,156 MT).

  • AUCTION OF COAL MINES FOR SALE OF COAL

    Updated mine summary of Bandha and Brahmadiha coal mines, Corrigendum No.3 to Standard Tender Document & Corrigendum No.3 to Standard CMDPA/CBDPA, additional documents for Urtan, Thesgora-B/Rudrapuri, Marwatola Sector-VI & VII, Chakla and Takli-Jena Bellora (North) and Takli-Jena Bellora (South), Gare Palma IV/1, Gare Palma IV/7, Marki Mangli-II, Gotitoria East & West, Radhikapur East

  • Court orders Centre to produce records on coal block

    Sep 18, 2013· Justice Lodha also wanted to know from the AG how many private captive power plants were allocated coal blocks between 1993 and 2003; 2003

  • GoM to decide on green nod for captive coal blocks Most

    GoM to decide on green nod for captive coal blocks Most of these blocks come under ‘no go mining zones by Rakesh Kumar Kubde · February 27, 2012 Green clearance to coal blocks allocated to ultra mega power projects of companies such as Reliance Power, Essar and Adani are likely to be taken up by the ministerial panel on March 1.

  • Coal Mining And MDO Model In India Energy and Natural

    However, the sector witnessed a major overhaul after the Supreme Court of India, in 2014, quashed allocation of 214 coal blocks cancelling nearly all existing permissions for the captive mining of coal blocks. The verdict set the ground for fresh legislation and reform in the coal industry. 2

  • Ministry of Mines

    On the lines of commercial coal mining, all mineral blocks may also be auctioned for commercial mining without distinction of captive or merchant mines. The proposal seeks to remove distinction between captive and merchant mines by ensuring that in future all mines

  • FSPDB Mersen

    captive metric wire termination screws. Screws can never be lost. • Available accessories: For multi-pole panel mounting, simply snap in pins for rigid fit. Cap plugs provide the ability to maintain touch safety on unused openings. Circuit identification markers simply snap into blocks to ID circuits. End anchors provide rigid end stops.

  • Reforms push to coal is justified The Hindu BusinessLine

    Jun 22, 2020· Captive mining of small blocks, a decontrol move that was initiated in 1993 and continued right up to the coal scam, has been an inefficient process. leading to power

  • Ministry of Mines

    sold due to the restriction in law.. On the lines of commercial coal mining, all mineral blocks may also be auctioned for commercial mining without distinction of captive or merchant mines. The proposal seeks to remove distinction between captive and merchant mines by ensuring that in future all mines will be auctioned without any end

  • 1.1 PHASES OF A MINING PROJECT ELAW

    The first way in which proposed mining projects differ is the proposed method of moving or excavating the overburden. What follows are brief descriptions of the most common methods. 1.1.3.1 Open-pit mining Open-pit mining is a type of strip mining in which

  • Government of India Ministry of Power ULTRA MEGA POWER

    Integrated power project with dedicated captive coal blocks for pithead projects. 4. The Bidding Process . (ii) The Infrastructure SPV:The captive coal block, the total coal block land . can be started without a clear identification of a suitable site by the State

  • AUCTION OF COAL MINES FOR SALE OF COAL

    Updated mine summary of Bandha and Brahmadiha coal mines, Corrigendum No.3 to Standard Tender Document & Corrigendum No.3 to Standard CMDPA/CBDPA, additional documents for Urtan, Thesgora-B/Rudrapuri, Marwatola Sector-VI & VII, Chakla and Takli-Jena Bellora (North) and Takli-Jena Bellora (South), Gare Palma IV/1, Gare Palma IV/7, Marki Mangli-II, Gotitoria East & West, Radhikapur East

  • Mand Raigarh Coalfield Wikipedia

    Mand Raigarh Coalfield is spread over an area of 520 square kilometres (200 sq mi). The field has a potential for mining of power grade coal, much of which can be extracted through open cast mining. Gare block has been identified for captive mining by private companies.

  • Government To Allow Commercial Mining In Coal Sector

    May 17, 2020· A total of 500 mining blocks will be offered through an open and transparent auction process, with nearly 50 blocks to be offered immediately.

  • Auction of 348 non-captive mines: Only 2 states submit

    Mar 12, 2018· Under the old mining law, the states had the powers to grant the mining lease to any company as per their discretion. The 2015 mining law clearly states that if a company has already got the ML of a non-coal block for captive purposes, it can continue to mine it till the lease period ends.

  • Introduction to Data Mining

    1. Discuss whether or not each of the following activities is a data mining task. (a) Dividing the customers of a company according to their gender. No. This is a simple database query. (b) Dividing the customers of a company according to their prof-itability. No. This is an accounting calculation, followed by the applica-tion of a threshold.

  • Mand Raigarh Coalfield Wikipedia

    Mand Raigarh Coalfield is spread over an area of 520 square kilometres (200 sq mi). The field has a potential for mining of power grade coal, much of which can be extracted through open cast mining. Gare block has been identified for captive mining by private companies.

  • Court orders Centre to produce records on coal block

    Sep 18, 2013· Justice Lodha also wanted to know from the AG how many private captive power plants were allocated coal blocks between 1993 and 2003; 2003

  • Information Bulletin

    examples of sites where normal fixed power plants are not always a feasible investment. By launching Modular Block, Wärtsilä offers a solution that gives all mining sites, wherever they are and whatever their short- or long-term needs are, the opportunity to have their own captive power generating capacity. The Wärtsilä Modular Block

  • GoM to decide on green nod for captive coal blocks Most

    GoM to decide on green nod for captive coal blocks Most of these blocks come under ‘no go mining zones by Rakesh Kumar Kubde · February 27, 2012 Green clearance to coal blocks allocated to ultra mega power projects of companies such as Reliance Power, Essar and Adani are likely to be taken up by the ministerial panel on March 1.

  • FSPDB Mersen

    captive metric wire termination screws. Screws can never be lost. • Available accessories: For multi-pole panel mounting, simply snap in pins for rigid fit. Cap plugs provide the ability to maintain touch safety on unused openings. Circuit identification markers simply snap into blocks to ID circuits. End anchors provide rigid end stops.

  • Nirmala Sitharaman Says Rs 50,000 Crore To Create

    May 16, 2020· The government will bring in commercial mining in coal sector, Finance Minister Nirmala Sitharaman said on day 4 of her announcements on details of a

  • The Indian coal sector: Challenges and future outlook

    production coming from government-controlled mines. The policy for captive mining was introduced in 1993. This opened the coal sector to private investment, although no promising progress has been made in the captive coal blocks allotted by the government. Out of the 200 allocated blocks (22 have been de-allocated), only 30 mines have

  • 1.1 PHASES OF A MINING PROJECT ELAW

    The first way in which proposed mining projects differ is the proposed method of moving or excavating the overburden. What follows are brief descriptions of the most common methods. 1.1.3.1 Open-pit mining Open-pit mining is a type of strip mining in which

  • Introduction to Data Mining

    1. Discuss whether or not each of the following activities is a data mining task. (a) Dividing the customers of a company according to their gender. No. This is a simple database query. (b) Dividing the customers of a company according to their prof-itability. No. This is an accounting calculation, followed by the applica-tion of a threshold.

  • AUCTION OF COAL MINES FOR SALE OF COAL

    Updated mine summary of Bandha and Brahmadiha coal mines, Corrigendum No.3 to Standard Tender Document & Corrigendum No.3 to Standard CMDPA/CBDPA, additional documents for Urtan, Thesgora-B/Rudrapuri, Marwatola Sector-VI & VII, Chakla and Takli-Jena Bellora (North) and Takli-Jena Bellora (South), Gare Palma IV/1, Gare Palma IV/7, Marki Mangli-II, Gotitoria East & West, Radhikapur East

  • PM launches Auction process of Coal blocks for Commercial

    PM launches Auction process of Coal blocks for Commercial mining India has taken a major decision to fully open the coal and mining sectors for competition, capital, participation and technology : PM Coal sector reforms will make eastern and central India, our tribal belt in, pillars of development: PM Self-reliance is not possible without a strong mining and mineral sector: PM

  • Commercial mining: Steel cos stay away from bidding in

    Oct 02, 2020· Read more about Commercial mining: Steel cos stay away from bidding in coking coal blocks on Business Standard. No steel company has shown interest in bidding for four coking coal blocks of 38 mines put on auction for commercial mining as

  • REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL

    mining and supply of coal from allotted captive coal block for the requirement of existing/new thermal power stations of RVUN and/or for new projects of the State. 3. On 2.8.2007, a Letter of Intent (for short, ‘LoI’) was issued by RVUN in favour of Adani Enterprise Limited (for short, ‘AEL’) for

  • India eases rules and throws open coal mining to all companies

    In the wake of this ruling, the government in 2015 held its first auction of coal blocks, putting up 34 assets for bidding but restricted to captive mining by metal and power companies for their

Previous: Product Of Uranium Milling Process
Next: White Quartz Stone Crusher Price
© Copyright - LW Crusher